Chula Vista Medical Center (MOB)

Opportunity

Status

Estimated Start:

Total Annual Savings

Project Cost:

Project Payback:  

Description

Capital Upgrade - High Efficiency Boiler Replacement

Not Started

FY 2025

$2,300

$136,800

59.5

Replace boilers (B-1 & B-2) with high-efficiency condensing boilers. The 0.5 MMBTU boiler serving the heat pump water loop and the 1.8 MMBTU boiler on the roof serving the variable air volume (VAV) terminal units should both be replaced.

Recommendation: 

See above Descriptions.